Formwork & Concrete Estimating Projects

Every number below was measured by someone who's stood on that formwork. Here's a selection of formwork and concrete estimating work completed by Perform for subcontractors and builders across Brisbane, Queensland, and Australia.

High-rise formwork take-off for The Landmark Brisbane — 146,000m² Stage 1

The Landmark, Brisbane

One of Brisbane's most significant high-density residential developments. Stage 1 formwork estimating scope covered 146,000m² across multiple towers, with complex slab geometries, transfer levels, and full Bluebeam markup package provided.

Formwork estimating Kirra Beach — 60,000m² concrete structure takeoff

Kirra Beach Project

60,000m² formwork package for a major coastal residential development on the Gold Coast.

Formwork quantities for Lambert Street Kangaroo Point residential development — 92,600m²

Lambert Street, Kangaroo Point

Large-scale residential development requiring detailed take-offs across multiple building types. Scope included suspended slabs, feature formwork elements, and comprehensive stripping quantities for the formwork subcontractor.

Feature and Class 2 formwork estimating luxury residential Bardon Brisbane

75 Outlook Crescent, Bardon

Premium residential project requiring feature, Class 2, and off-form boardform formwork take-offs. Scope included raking edgeboard, curved feature stairs, and upstand walls — among the most technically complex residential estimating work in the portfolio.

Formwork takeoff Quay Residences — 40,000m²

Quay Residences

40,000m² residential formwork package.

Formwork BOQ Warriewood residential — 40,000m² multiple buildings

Warriewood Residential Development

Multi-building development with complex pour sequencing. BOQ structured to allow efficient repricing across stages as drawings evolved through the tender period.

NOW ACCEPTING NEW CLIENTS.

Brisbane-based. Available for remote formwork estimating and construction consulting work across Australia.